Fabrication & Construction

Fabrication

At Consulmet, we deliver high-quality, fast-track projects, a commitment underpinned by significant investment in our fabrication capabilities. Located in Klerksdorp, west of Johannesburg, our purpose-built Consulmet Construction facility is a testament to our commitment to quality and efficiency.

Spanning 4.4 hectares, our comprehensive facility brings together structural steel, plate, and piping fabrication for all our plants under one roof. This streamlining allows for seamless coordination and swift project execution. The facility comprises 7,050 square meters of workshops and two 1,000 square meter covered spaces, forming part of a large laydown area that covers over 3.3 hectares.

Our commitment to quality extends to all aspects of fabrication, with laser cutting, folding, welding, blasting, and painting all completed in-house. We adhere to strict quality assurance processes that comply fully with SABS and meet the high standards of our clients, including industry leaders such as Rio Tinto and Anglo American.

Sourcing structural steel and materials from reputable suppliers like Arcelor Mittal and Columbus Stainless allows us to guarantee the quality of our solutions.

Hopper being fabricated at Consulmet Construction
Interior of Consulmet fabrication facility
Laydown area at Klerksdorp
Laydown area at Klerksdorp

Trial Erection

A cornerstone of our Project Delivery Model is the trial erection of all our plants before they are disassembled for painting and packing for shipment.  This rigorous process minimises the duration of on-site construction and eliminates the high costs traditionally associated with reworking components on-site that do not fit.

During the trial erection, we trial fit all major equipment, conduct water tests on our Dense Media Separation (DMS) circuits, trial run pumps, and energise all drives.  This process allows us to confirm the compatibility of all components, ensuring a smoother and more efficient installation at your project site.

Depending on the logistics strategy of a particular project, we may ship fully assembled modules to expedite installation further and accelerate the commencement of operations.

Trial erection of 150 tph lump DMS module
Trial erection of 550 tph ROM bin
Trial erection of 550 tph Crushing Circuit

Construction

At Consulmet, we believe in the power of continuity.  To minimise site construction duration and costs, we deploy the same team that carries out the trial erection of the plant to oversee the on-site installation.  Our approach ensures a thorough understanding of the project specifics, which drives efficiency and quality on-site.

We provide a complete site construction and installation service, offering a full spectrum of essential services.  These include:

200 tph DMS under construction
Foundations for 550 tph Crushing Circuit under construction